Checks if synchronization has ended
Should be called when the synchronization has finished
Remove all archive at selected rim path
Should be call on timeout timeout
Finish flag set when the Fiber function returns
Set via the timeout method to indicate and network timeout
Max number of archives operates in one recorder action
Contains the reference to SynchronizationFiber
Recommend to put a yield the SynchronizationFiber between send and receive between the DART's
Stores the add and remove actions in the journal replay log file
This function is called when whole branches doesn't exist in the foreign DART and need to be removed in the local DART
This function is called when the SynchronizationFiber run-function finishes
Called in by the SynchronizationFiber constructor which enable the query function to yield the run function in SynchronizationFiber
Checks if the syncronizer is empty
Standards DART Synchronization object